Pile Gripper Arms
At Houlder, our Pile Gripper Arms have been installed on the MPI Discovery wind turbine installation vessel. Houlder engineers helped to fast-track installation of turbines through hydraulically stabilising 6m diameter steel piles as they are driven into the seabed.Visit the Houlder Ltd website for more information on Pile Gripper Arms